Why construction needs its own contract
Construction projects have risks most contracts never deal with: hidden conditions behind walls, weather delays, material price swings, permits and inspections, subcontractors, and lien rights. A general contract leaves those gaps open. A construction contract fills them, which is why most disputes between owners and contractors trace back to a contract that was too short.
What your Construction Contract covers
Choosing a pricing method
| Method | How it works | Best when |
|---|---|---|
| Fixed price (lump sum) | One price for the defined scope | Plans are complete and scope is clear |
| Cost-plus | Actual costs plus a fee (percentage or fixed) | Scope is uncertain; owner wants transparency |
| Cost-plus with GMP | Cost-plus capped at a guaranteed maximum price | Owner wants transparency and a ceiling |
| Time and materials | Hourly labor rates plus materials | Small repairs and service work |
With a cost-plus contract, the owner should have the right to review invoices and receipts; with fixed price, the scope and exclusions must be precise, because anything not in the scope will come back as a change order.
Payment schedules that protect both sides
- Deposit — reasonable and tied to mobilization or material orders. Some states cap home-improvement deposits; California, for example, limits most home improvement down payments to the lesser of 10% or $1,000.
- Progress payments tied to completed milestones — foundation, framing, rough-in, drywall — rather than dates.
- Retainage — often 5–10% held back until completion and punch list, if your state permits it for the project.
- Lien waivers from the contractor and major subs with every payment, so the owner does not pay twice. See mechanics liens and waivers.
Change orders
Almost every project changes. The contract should require that any change in scope, price or schedule be documented in a signed change order before the extra work is done. That one clause prevents most end-of-job billing disputes. BizDocs has a separate construction change order form that ties back to this contract.
Other clauses that matter
Permits and code compliance
State who pulls and pays for permits — usually the contractor — and that work will meet applicable codes and pass inspection.
Insurance and licensing
Require the contractor to carry general liability and workers' compensation insurance and to hold any license your state requires. Many states require specific contract disclosures from licensed home-improvement contractors.
Warranty
A workmanship warranty — one year is common — plus a pass-through of manufacturer warranties on materials and equipment.
Delays and termination
Define excused delays (weather, owner changes, permit delays), whether there are liquidated damages for late completion, and when either party can terminate for non-payment or failure to perform.