CONSTRUCTION CONTRACT

Prepared with BizDocs

Owner Laura Kim · Contractor Ironwood Builders Inc. · Project Detached garage, 2214 Pine Rd

Scope

Per plans dated Apr 3, 2026, including slab, framing and roof.

Price

Fixed price $64,800, 5 progress payments.

Schedule

Substantial completion within 90 days of permit.

…

Owner
Contractor

Why construction needs its own contract

Construction projects have risks most contracts never deal with: hidden conditions behind walls, weather delays, material price swings, permits and inspections, subcontractors, and lien rights. A general contract leaves those gaps open. A construction contract fills them, which is why most disputes between owners and contractors trace back to a contract that was too short.

What’s included

What your Construction Contract covers

your answers shape each section — anything that doesn’t apply stays out
Scope of work — plans, specifications and exclusions
Contract price and pricing method — fixed, cost-plus, or time and materials
Payment schedule and retainage — tied to milestones, with lien waivers
Schedule and delays — start, completion, weather and excused delays
Change order procedure — written, priced and signed before work
Warranty, insurance, permits and disputes — who carries what risk

Choosing a pricing method

MethodHow it worksBest when
Fixed price (lump sum)One price for the defined scopePlans are complete and scope is clear
Cost-plusActual costs plus a fee (percentage or fixed)Scope is uncertain; owner wants transparency
Cost-plus with GMPCost-plus capped at a guaranteed maximum priceOwner wants transparency and a ceiling
Time and materialsHourly labor rates plus materialsSmall repairs and service work

With a cost-plus contract, the owner should have the right to review invoices and receipts; with fixed price, the scope and exclusions must be precise, because anything not in the scope will come back as a change order.

Payment schedules that protect both sides

  • Deposit — reasonable and tied to mobilization or material orders. Some states cap home-improvement deposits; California, for example, limits most home improvement down payments to the lesser of 10% or $1,000.
  • Progress payments tied to completed milestones — foundation, framing, rough-in, drywall — rather than dates.
  • Retainage — often 5–10% held back until completion and punch list, if your state permits it for the project.
  • Lien waivers from the contractor and major subs with every payment, so the owner does not pay twice. See mechanics liens and waivers.

Change orders

Almost every project changes. The contract should require that any change in scope, price or schedule be documented in a signed change order before the extra work is done. That one clause prevents most end-of-job billing disputes. BizDocs has a separate construction change order form that ties back to this contract.

Other clauses that matter

Permits and code compliance

State who pulls and pays for permits — usually the contractor — and that work will meet applicable codes and pass inspection.

Insurance and licensing

Require the contractor to carry general liability and workers' compensation insurance and to hold any license your state requires. Many states require specific contract disclosures from licensed home-improvement contractors.

Warranty

A workmanship warranty — one year is common — plus a pass-through of manufacturer warranties on materials and equipment.

Delays and termination

Define excused delays (weather, owner changes, permit delays), whether there are liquidated damages for late completion, and when either party can terminate for non-payment or failure to perform.

Homeowners: check for a right to cancel. Under the FTC's cooling-off rule and many state laws, homeowners often have three business days to cancel certain contracts signed at home. Contractors must give the required notice.
How it works

Three steps to a finished document

1

Answer questions

Plain-English questions about your situation, parties, and terms.

2

Review the document

Read what was written from your answers and fine-tune any section.

3

Download & use

Export as PDF or Word — and come back to edit any time.

Fair questions

Construction Contract questions

Scope of work with plans and exclusions, price and pricing method, payment schedule, start and completion dates, change order procedure, permits, insurance, warranty, lien waivers, and how disputes and termination are handled.
A fixed-price contract sets one price for a defined scope, putting cost risk on the contractor. A cost-plus contract reimburses actual costs plus a fee, putting cost risk on the owner but giving full transparency.
It varies, and some states cap deposits on home improvement projects. A modest deposit tied to mobilization or material orders, followed by milestone payments, protects both sides.
Many states require a written contract for home improvement work above a certain dollar amount, with specific disclosures. Even where not required, a written contract is the best protection for both parties.
The contract should require a written, signed change order describing the change, its cost and any schedule impact before the work is performed.
Yes. Contractors, subcontractors and suppliers generally have mechanics lien rights. Collecting lien waivers with each payment protects owners from paying twice.
Often created together